Project

General

Profile

Bug #3793

In the DSE navigator, timing constraints and energy-related objectives get generated at each run

Added by Marco Volpe about 1 year ago. Updated about 1 month ago.

Status:
Rejected
Priority:
Normal
Assignee:
-
Category:
-
Target version:
Start date:
08/07/2019
Due date:
% Done:

0%

Estimated time:

Description

OBSERVED BEHAVIOR
When performing deplo+schedule or schedule syntheses, at each run timing constraints and energy minimization objectives get generated again and again inside the same target definition step.

EXPECTED BEHAVIOR
To be discussed.

TEST MODEL
Any model.


Related issues

Related to Feature #3802: Define GUI patterns for (non-periodic) timing constraintsNew08/21/2019

History

#1 Updated by Marco Volpe about 1 year ago

  • Related to Feature #3802: Define GUI patterns for (non-periodic) timing constraints added

#2 Updated by Marco Volpe 12 months ago

  • Target version changed from AF3 2.16 RC1 (Feature Freeze) to AF3 2.17 (Feature Freeze)

#3 Updated by Alexander Diewald 8 months ago

  • Target version changed from AF3 2.17 (Feature Freeze) to Backlog

#4 Updated by Marco Volpe about 2 months ago

  • Assignee changed from Marco Volpe to Johannes Eder

#5 Updated by Johannes Eder about 1 month ago

  • Status changed from New to Feedback
  • Assignee changed from Johannes Eder to Alexander Diewald

@Alex: Do you know if this issue is still relevant? I received it from Marco.

#6 Updated by Alexander Diewald about 1 month ago

It can be rejected IMO. The mchanism how the timing constraints are generated is reworked in the course of the ticket #3541 anyways :)

#7 Updated by Alexander Diewald about 1 month ago

  • Assignee changed from Alexander Diewald to Johannes Eder

#8 Updated by Johannes Eder about 1 month ago

  • Status changed from Feedback to Rejected
  • Assignee deleted (Johannes Eder)

Also available in: Atom PDF