Period marker is wrongly assigned / drawn in the schedule view
Current status
See attached image.
Steps to reproduce
- Import the attached model
- Assign all tasks to a single ECU
- Create a DSE an synthesise a schedule
(from redmine: issue id 3661, created on 2019-02-27, closed on 2019-04-05)
- Relations:
- blocks #3702 (closed)
- Uploads: