Selection of rule sets is not consistent with the checkbox when switching view
HOW TO REPRODUCE IT:
- open the enclosed model in the DSE
- create a constraint pattern, e.g., an allocation pattern
- in the deployment synthesis view, generate a rule set containing the pattern
- select the checkbox with the rule set and run the synthesis
- after the run, switch to schedule view and then back to deployment view
- the checkbox for the rule set does not appear selected, but when a synthesis is launched the rule set is considered active
(from redmine: issue id 3792, created on 2019-08-07, closed on 2019-09-27)
- Uploads: