Render the route calculation in the schedule skeleton genertaion optional
Current status
The AllocationToSchedule util class constructs routes automatically if the schedule skeleton generation is called.
Proposed change
Make the route calculation optional such that a set of pre-constructed routes can be considered when constructing the schedule skeleton. This is useful for the integration within other solvers.
(from redmine: issue id 3743, created on 2019-06-03, closed on 2019-06-05)