process enactment
Current
- Double click on a project on the project exploration toolbar. A constraint editor will pop-up with the possibility to build configurations from constraints.
- A process exists in term of dependencies, but is not used in practice
Desired
- The next objective is the first configuration where not all constrains are satisfied following the dependencies until all constraints are satisfied
- A color code should be used to display which constraints have been satisfied so far, the ones that haven’t and the current objective
(from redmine: issue id 3039, created on 2017-08-18)