Mira - copying requirements within the same project
When coping a requirement, the new name is generated as follows:
add the word “(new)” to the name of the last existing requirement.
This should be improved. The name of the copied requirements should be included in the name of the new requirement.
(from redmine: issue id 2302, created on 2015-02-23, closed on 2015-04-23)
- Relations:
- relates #2304 (closed)